Category

Infrastructure

Location

Congo

Year

2021

Rehabilitation of transformer substations

Finishing work on the civil engineering of the Dechango, Cité de 17 and Faubourg substations was carried out to ensure the completion and installation of the components required for their proper operation. This work includes the installation of the equipment and civil engineering infrastructure needed to guarantee the safety and performance of the substations.

At the same time, civil engineering reservations were lifted for the 37 substations rehabilitated. The aim of this work was to verify and correct any non-conformities or defects identified during inspections.

In addition, 40 MV/LV substations have been equipped to ensure optimal operation. This includes replacing existing equipment with more efficient equipment adapted to current needs.